64" Pipeline Design & Installation Support

Overview

This project involved supporting the design and installation of a 64" diameter pipeline in coordination with the installation contractor, surveyor, and a 3D scanning provider. My role focused on refining the pipeline geometry based on updated site data and producing accurate fabrication-ready pipe lengths and alignment adjustments.

PIPELINE 3.jpg

Issue & Engineering Approach

The initial design was based on legacy survey data, which was found to be inaccurate once field conditions were verified. This created a risk of cumulative fit-up errors across the pipeline due to tight coupling tolerances.

To address this, the design was updated using high-accuracy 3D scan data and field verification in coordination with the surveyor and installation contractor.

The process involved:

  • Integrating updated survey and 3D scan data into the design model

  • Refining pipe lengths, slopes, and support locations based on as-built conditions

  • Iteratively validating geometry through multiple field scan campaigns

  • Coordinating design adjustments with installation sequencing

A total of four different scans were used to progressively refine the installation:

  • Initial design validation, routing and lengths

  • Post pour confirmation of footing and support locations

  • Post-installation verification of installed pipe sections

  • Final confirmation of angles and lengths for remaining tie-in sections

Design & Coordination Updates

Given the tight installation tolerances, each pipe segment required precise fabrication control:

  • Pipe sections were detailed to exact cut lengths based on verified field geometry

  • Slope and alignment were adjusted to match actual installed conditions

  • Support locations were refined to match as-built structural constraints

  • Coordination with the contractor ensured installability within sequence constraints

Each pipe joint required careful control due to coupling tolerances of ±3/16" and 0.35° angular misalignment.

PIPELINE 1.jpg

Outcome

The updated design and iterative scan-based approach enabled accurate fabrication and installation of pipeline segments within tight geometric tolerances.

Close coordination between surveying, scanning, and fabrication reduced the risk of misalignment and ensured successful fit-up across multiple installation stages.

Have a worn or obsolete component that needs to be rebuilt?
Send a photo, scan, or existing information to get started.

FACTOR ENGINEERING

Southern California

908-319-5692

  • LinkedIn

© 2023 by Company Name. Proudly created with Wix.com

bottom of page